Preloader logo

Blog categories

Comments

References – Datteln – 1100MW Coal Power Plant, Germany

Image module

Scope of Work MAN AUTOMATION:

Service on site

  • Cold and Hot Commissioning of the Steam Turbine 1 x 1100MW and the BFPT with Melody Control System and 800xA from ABB
  • Different Troubleshooting Activities on the DCS System and Troubleshooting on the TGC Cabinets
  • Start Up and Operational Support