Preloader logo

Blog categories

Comments

References –  Öresundsverket, Combined Cycle Power Plant, Malmö, Sweden

Image module

Scope of Work MAN AUTOMATION:

Basic & Detailed Engineering

  • Software Test of the Turbine Governor Control System
  • Control System Optimization
  • HMI Visualization
  • Testing I/O Signals
  • HW Troubleshooting

Service on site

  • HMI Upgrade of the Control System
  • Commissioning of the new HMI System
  • Troubleshooting and Optimization of the Control System